Mian Villas
15 Feb 2026

15 Feb 2026

87%Overall▲ +3% · vs previous visit

Main video

Engineering Report

Significant progress has been achieved in the Mayan Villas project, with the overall completion rate reaching 87%. Current work is focused on final facade finishes, paving works, and general site preparation, alongside the completion of concrete structures for the remaining service buildings.
Detected changes
Exterior Facades and Finishes95%

Completion of exterior plastering, profile painting, and installation of decorative metal screens for windows across most villas.

General Site and Roadworks90%

Progress in asphalt paving for internal roads, installation of curbstone, and interlocking tiles for pedestrian walkways.

Concrete Structure (Service Buildings)95%

Ongoing formwork and reinforcement steel works for a central building (mosque or service facility) at the heart of the project.

Roofing and Mechanical Works90%

Installation of overhead water tanks and piping extensions on the roofs of completed villas.

Progress reading

The visual progress aligns with the reported completion rates; the images reflect that finishing works have reached 80%, evidenced by the completion of entire block facades. The increase in the fencing category (+5%) is visible in the completion of front villa walls and the installation of gates.

vs previous visit

Compared to the previous visit, the project has progressed from the structural and plastering stages in several sectors to the final painting phase and the installation of rooftop mechanical systems, with a clear improvement in general site organization and street paving.

Expected next milestones

Completion of street lighting, finishing landscape works, and commencing final inspection procedures for electrical and mechanical systems.

Progress

0%OverallAverage item progress
0/5 completeavg ▲ +4%
Concrete Works▲ +1%
0%
Finishing Works▲ +6%
0%
Mechanical Works▲ +5%
0%
Electrical Works▲ +1%
0%
Fencing▲ +5%
0%